Case Study

Common Wealth Games, New Delhi-2010

Powermak was chosen to provide complete turnkey power rental solutions for Common Wealth Games Village, New Delhi by the international overlay service firm M/s. GL Litmus Events Consortium, France. Powermak was responsible for the continuous and uninterrupted power supply for the common wealth games village for a period of almost 2 months. Powermak provided 26 power units of 13,860 KVA of Diesel Generators ranging from 250 to 1000 KVA. (See testimony)

Aero India-2007, Indian Aviation 2008, 2010

In the year 2007, Powermak executed India’s first ever & the largest short term rental contract of 18000 KVA for Federation of Indian Chamber of Commerce & Industry at Bangalore Air Force Station. More than 50 units of mini power stations ranging from 30 to 1000 KVA were provided at 10 key strategic locations like communication and international chalets. For the first time, Powermak became the only power rental company in the country to lease out such large fleet of power units for such an enormous project. The company’s power packed performance fetched a repeat order of 8000 KVA for Indian Aviation 2008 & 2010. (See testimony)

Critical Power Outrage - NMDC

On the request of the top management of NMDC, Powermak rushed 5 mobile power units to Kirandul and Bacheli townships during the collapse of high tension line due to naxal attack on three occasions. The DG sets were under round-the-clock operation and utilized for township lighting and drinking water pumping.

Opening ceremony of Rajiv Gandhi International Airport, Shamshabad.

Powermak was awarded the contract of supplying 14 units of mini power station of 5312 KVA for the opening ceremony of the prestigious Rajiv Gandhi International Airport, Hyderabad, India during March-2008.

DEFENCE SECTOR

a) NAVAL DOCK YARD – VIZAG, AP.

Powermak was selected by Naval Dock Yard, Viskhapatnam to provide 3000 KVA (sound proof) for PFR (Presidential Fleet Review) which was held first time in Vishakapatnam, AP. on 12th February, 2006. (See testimony)

b) AERO SHOW – 2001, 2003 & 2005

Powermak was chosen as the official alternate power supplier for three consecutive Aero shows conducted by the Directorate of Defense Exhibitions in Bangalore.

c) DRDL - Hyderabad

Powermak supplied & maintained a 1.8 MW power unit at the Defence Research & Development Laboratory (DRDL), Hyderabad.

d) HAL - Bangalore

Powermak ensured alternative power supply to Hindustan Aeronautics Limited (HAL). Total Installed Capacity: 1000 KVA.

NATIONAL GAMES 2003 & AFRO-ASIAN GAMES 2004

Powermak has been the power supplier for most of the major events conducted by the Govt of Andhra Pradesh. Total Installed Capacity: 4.32 MW

WORLD WOMEN’S TENNIS TOURNAMENT 2004

Powermak ensured uninterrupted power supply for this event held in Hyderabad.Total Installed Capacity: 500 KVA

ADB MEET – HYDERABAD 2006.

Powermak was selected by the Key Event Management company to supply the prime power supply of 4000 KVA sound proof DG sets to support the complete air conditioning systems at the ADB meet.

MISS WORLD PAGEANT 1996

Powermak was the official power provider at the Miss World Pageant held in India for the first time by ABCL.
Total Installed Capacity: 1.6 MW

DRINKING WATER PROJECTS

Powermak supplied continuous power for the purpose of pumping water from the Krishna River at the Kandaleru Dam in Nellore District, Andhra Pradesh. Total Installed Capacity: 3.16 MW

DREDGING OPERATIONS

Powermak supplied and maintained a power unit at the Cochin Port for the purpose of dredging. Total Installed Capacity: 500 KVA

LIQUID NATURAL GAS TERMINAL

This terminal at Dahej (Gujarat) was ensured alternative power supply by Powermak for the infrastructure project carried on by a Japanese construction company.
Total Installed Capacity: 650 KVA

SUGAR INDUSTRY

Powermak has been a regular alternative power provider to many sugar industries. We have provided up to 3.2 MW of power to a single industry, apart from various other capacities to several other units.

POWER PLANTS

Powermak provided start-up power supply for the initial set up of many Bio-gas power plants in Andhra Pradesh & Chattisgargh Total Installed Capacity: 3.4 MW

OFFSHORE REPAIR WORKS

Powermak supplied power for major ship repair works at Goa, Tuticorin & Chennai port harbours.

Total Installed Capacity: 1000 KVA ; 750 KVA & 180 KVA.

IT / CALL CENTRES/BPO

Powermak has provided uninterrupted power supply to various call centres to ensure smooth operation of their activities. In Bangalore, HSBC was provided a special package. Total Installed Capacity: 5 MW

SOFTWARE PARKS/ FIRMS

Powermak has been the most obvious choice of many of the major Software companies in India. We have the privilege of serving almost all multinational companies and leading Indian IT firms.

ON SHORE OIL EXPLORATION WORKS

Powermak was awarded the contract of supplying prime power DG sets for oil exploration project by CAIRN ENERGY INDIA PVT LTD for their Barmer Drilling Blocks.

Powermak supplied multiple units of power generators for the East West Gas Pipe Line project of Reliance Industries Limited including the critical vacuum drying operations across the length of the pipeline.

Total installed capacity – 5 MW